Engine Lathe with Long Lead Capability

Verified
PorebaTPK806M-2344.jpg
P.O. Box 20118, Worcester, MA 01602, USA

Poreba Model TPK80/6M 32″ x 236″ Engine Lathe, 19.5″ 4-Jaw Chuck, Inch/Metric Threading, Hardened Bed, Power Compound, Power Rapid Traverse, 3.75″ Hole in Spindle, 4-Way Tool Post, (2) Steady Rests, Taper Attachment, Tailstock, Coolant, New 1977.

http://www.agreenco.com/PorebaTPK806M-2344.html

Showing 7 results
Post as a guest by filling out the fields below or if you already have an account.
Name*
E-mail*
Website
Message*